AAA OFFICE BUILDING
SOLIDERE - BEIRUT-
Block 20-02

Owner / Client : SOLIDERE
Developper : SOLIDERE
Design Cabinet : MAKI & ASSOCIATES JAPAN ARUP JAPAN - Barbanel ME
Local Architect : FMCP Fouad Menem
Mission : Electro-mechanical (Design & Supervision)
Area : 24.000 sq.m
MEP installation Cost : 28.0 M US$
Year : 2011 - 2012
Location : BEIRUT - LEBANON

PROJECTS SPECIFICITY
42 PRIVATE VILLAS WITH LEISURE CLUB AND
SWIMMING POOL
PUBLIC & PRIVATE LANDSCAPE AREAS.

TECHNICAL DATA
DX MULTI SPLIT SYSTEM FOR EACH PRIVATE ENTITY
SERVING FOR COOLING AND HEATING MODES.
INDIVIDUAL GAS BOILER WITH HEATING LAYOUT FOR
EACH VILLA & THE LEISURE CLUB.
COLLECTIVE WASTE & STORM WATER COLLECTION
& TREATMENT FOR IRRIGATION USE IN THE WHOLE
SITE + VILLAS.SOLAR SYSTEM FOR VILLAS & LEISURE CLUB.POWER PLANT: 1000 KVA


back to master page