Back to List << AUB - CENTRAL PLANT/ TUNNEL Category: Universities / Colleges Area: 3,000 m2 Client /Owner: AUB - FPDU Design Cabinet: AUB - FPDU - Barbanel ME Architect: Mission Desc: MEP CONSULTANT Design Date: 2004 Opening Date: 2008 MEP Cost: $3,000,000
AUB - CENTRAL PLANT/ TUNNEL
Category:
Area:
Client /Owner:
Design Cabinet:
Architect:
Mission Desc:
Design Date:
Opening Date:
MEP Cost: