BEIRUT CITY CENTER LEBANON Owner / Client : Majid Al Futaim Properties -UAE Developper : Majid Al Futaim Properties - Dubai - UAE Design Cabinet : SKP -Barbanel ME Architect : SKP Mission : Electro-mechanical (Design & Supervision) Area: 188 000 sq. m MEP installation Cost: N.A. Year : 2009- 2012 Location : Beirut Lebanon | PROJECTS SPECIFICITY 8 CINEMAS TO 420 SEATS CARREFOUR HYPERMARKET 13.000 SQ.M MALL LENGTH 335 METERS 4 LEVELS RETAILS 3 LEVELS PARKING : 2.800 CARS TECHNICAL DATA 3 CHILLERS 5000 KW EACH TOTAL 15 MW GENERATORS SETS 18 MW ESCALATORS 20 UNITS TRAVELATORS 16 UNITS ELEVATORS 15 UNITS LEED TARGET: GOLD EXTERNAL TEMPERATURE CONDITION35C
 | | |
|
|

AAA OFFICE BUILDING SOLIDERE - BEIRUT- Block 20-02
Owner / Client : SOLIDERE Developper : SOLIDERE Design Cabinet : MAKI & ASSOCIATES JAPAN ARUP JAPAN - Barbanel ME Local Architect : FMCP Fouad Menem Mission : Electro-mechanical (Design & Supervision) Area : 24.000 sq.m MEP installation Cost : 28.0 M US$ Year : 2011 - 2012 Location : BEIRUT - LEBANON | PROJECTS SPECIFICITY 42 PRIVATE VILLAS WITH LEISURE CLUB AND SWIMMING POOL PUBLIC & PRIVATE LANDSCAPE AREAS.
TECHNICAL DATA DX MULTI SPLIT SYSTEM FOR EACH PRIVATE ENTITY SERVING FOR COOLING AND HEATING MODES. INDIVIDUAL GAS BOILER WITH HEATING LAYOUT FOR EACH VILLA & THE LEISURE CLUB. COLLECTIVE WASTE & STORM WATER COLLECTION & TREATMENT FOR IRRIGATION USE IN THE WHOLE SITE + VILLAS.SOLAR SYSTEM FOR VILLAS & LEISURE CLUB.POWER PLANT: 1000 KVA
 | | |
|
| |
|
|

Lebanon Waterfront City Dbayeh - Lebanon Owner / Client : Majid Al Futtaim Properties Dubai - UAE Developper : Majid Al Futtaim Properties Dubai - UAE Design Cabinet : ERGA GROUP Barbanel ME Architect : ERGA GROUP Mission : Electro-mechanical (Design & Supervision) Area: 140.000 sq. m MEP installation Cost: 45 M US$ Year : 2011 - 2013 Location : La Marina - Dbayeh Lebanon | PROJECTS SPECIFICITY RESIDENTIAL COMPOUND ON WATERFRONT SIDE @ LA MARINA DBAYEH WITH 300 APARTMENTS, 10 RESTAURANTS, 1 HEALTH CLUB, PEDESTRIAN AREA AND GARDENS
TECHNICAL DATA VRV PER APARTMENT CHILLER FOR HEALTH CLUB GAS DISTRIBUTION SYSTEM FOR ALL APARTMENTS AND RESTAURANTS WITH WALL MOUNTED GAS BOILER
 | | |
|
|

DEIR KOUBEL GATE DEIR KOUBEL CHOUF Owner / Client : Mr. WALID YOUNES Developper / Client Representant : AYMAN SANYOURA Design Cabinet : 109 ARCHITECTS - Barbanel ME Architect : 109 Architects Mission : Electro-mechanical (Design & Supervision) Area : 42 Villas + Leisure Club MEP installation Cost : 9.5 M$ US Year : 2011-2013 Location : DEIR KOUBEL CHOUF - LEBANON | PROJECTS SPECIFICITY 42 PRIVATE VILLAS WITH LEISURE CLUB AND SWIMMING POOL PUBLIC & PRIVATE LANDSCAPE AREAS.TECHNICAL DATA DX MULTI SPLIT SYSTEM FOR EACH PRIVATE ENTITY SERVING FOR COOLING AND HEATING MODES. INDIVIDUAL GAS BOILER WITH HEATING LAYOUT FOR EACH VILLA & THE LEISURE CLUB. COLLECTIVE WASTE & STORM WATER COLLECTION & TREATMENT FOR IRRIGATION USE IN THE WHOLE SITE + VILLAS.SOLAR SYSTEM FOR VILLAS & LEISURE CLUB.POWER PLANT: 1000 KVA
 | | |
|
|
|
|
cliquez sur les images pour ouvrir
|
|